Sign in
logo
Shenzhen Costar Technology Co., Ltd.
4yrs
Guangdong, China
Main categories: MMA WELDER,TIG WELDER,MIG WELDER,AIR PLASMA CUTTER,ARC WELDER
4YRSShenzhen Costar Technology Co., Ltd.

COMPANY OVERVIEW

Company Album

Basic Information

PRODUCT CAPACITY

Production Flow

PLUG IN MACHINE
Automatically install the taped electronic components on the printed circuit board according to the program
Wave soldering
The PCB with inserted components placed on the conveyor chain and passes through the solder wave crest to complete PCB joints soldering.
PCB debugging and dipping
Ensure that the parameters and functions of each PCB are correct, then dip insulating paint to prevent dust and static electricity.
Machine assembly
According to the operating instructions, ensure that the components of each model are installed accurately and in accordance with the standards.
Finished machine debugging
Adjust all accurate parameters and functions with professional equipment.

Production Equipment

Name
No
Quantity
Verified
PLUG IN MACHINES
PANASONIC 2344B
3
WAVE SOLDERING MACHINES
SM-PC-400DS
2
WELDING MACHINE COMMSIONING STATION
SJ-IV
6
WELDING MACHINE FULL LOADING STATION
SJ-III
6
Parameter analyzer
SJ1404
8
Verified

Factory Information

Factory Size
5,000-10,000 square meters
Factory Country/Region
Building C, Yongjianhong Science and Technology Park, 99 Yanshan Avenue, Yanchuan Community, Songgang Street, Baoan District, Shenzhen
No. of Production Lines
6
Contract Manufacturing
OEM Service Offered, Design Service Offered, Buyer Label Offered
Annual Output Value
US$2.5 Million - US$5 Million

Annual Production Capacity

Product Name
units Produced
highestEver
unit Type
Verified
WELDING MACHINE
80000
100000
Piece/Pieces
Verified

Facilities

Facilities
Supervisor
NO.of Operators
NO.of In-line QC/QA
Verified
PCB PLUG IN PRODUCTION LINE
1
2
1
WAVE SOLDERING PRODUCTION LINE
1
8
2
Machine assembly production line
1
12
1
Testing production line
1
8
8
Packing line
1
2
1
Verified

QUALITY CONTROL

Quality Management Process

PCB debugging and dipping
Ensure that the parameters and functions of each PCB are correct, then dip insulating paint to prevent dust and static electricity.
Finished machine debugging
Adjust all accurate parameters and functions with professional equipment.
Full loading testing
10 mins full loading testing to determine and ensure that the system can still operate normally even if the maximum expected workload is exceeded.
Welding/ Cutting twice testing
The purpose of testing welding results is to ensure the integrity, reliability, safety and usability of our machines.

Test Equipment

Machine Name
Brand & Model NO
Quantity
Verified
WELDING MACHINE COMMSIONING STATION
SJ-IV
6
WELDING MACHINE FULL LOADING STATION
SJ-III
6
Parameter analyzer
SJ-1404
8
Verified

R&D CAPACITY

Research & Development

Less than 5 People